Horizon Ridge Wind (30INR0128)
Horizon Ridge Wind is a 406.6 MW other interconnection project in Winkler, Texas with a current status of active. It is proposed to connect at POIB is 131853 NOTSW_1_8 - the Notrees SW Substation - Project includes property in Ector, Andrews, and Winkler counties. .
406.6 MWCapacity
ActiveStatus
WinklerMarket
OtherTechnology
Project facts
| Canonical name | Horizon Ridge Wind |
|---|---|
| Queue ID | 30INR0128 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Winkler |
| Technology | Other |
| Capacity | 406.6 MW |
| State | Texas |
| County | Winkler |
| Point of interconnection | POIB is 131853 NOTSW_1_8 - the Notrees SW Substation - Project includes property in Ector, Andrews, and Winkler counties. |
| Requested (queue) date | 2026-09-10 |
| Proposed in-service date | 2030-04-23 |
| Operational date | — |
| Withdrawn date | — |
| Developer | CPV Valley, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | active | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata