Hornet Solar II (TX) (Hybrid) (67985_HRT2B)

Hornet Solar II (TX) (Hybrid) is a 200.0 MW battery interconnection project in Swisher, Texas with a current status of active.

200.0 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameHornet Solar II (TX) (Hybrid)
Queue ID67985_HRT2B
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketERCO
TechnologyBattery
Capacity200.0 MW
StateTexas
CountySwisher
Point of interconnection
Requested (queue) date
Proposed in-service date2028-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerVesper Energy Development LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata