Swisher County, Texas — Interconnection Projects

The interXdata warehouse tracks 26 interconnection projects in Swisher, Texas, representing 7,534 MW of requested capacity.

26Total projects
5Active
10Operational
11Withdrawn
7,534 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar133,760 MW
Wind51,327 MW
Other41,145 MW
Battery3800 MW
Solar+Battery1502 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Commodus 2 Wind29INR0033Other641.5 MWoperationalSwisher, Texas
Hornet Solar23INR0021Solar602.4 MWoperationalSwisher, Texas
Hornet Solar (TX)65463_HRNETSolar600.0 MWoperationalSwisher, Texas
Frye Storage22INR0402Other503.9 MWoperationalSwisher, Texas
Commodus 2 Solar29INR0032Solar502.1 MWoperationalSwisher, Texas
Frye Solar20INR0080Solar+Battery502.0 MWoperationalSwisher, Texas
Comanche Run Wind12INR0029Wind500.0 MWwithdrawnSwisher, Texas
Hecate Energy Frye Solar LLC64233_80995Solar500.0 MWoperationalSwisher, Texas
Kress 115kVGEN-2019-064Battery400.0 MWwithdrawnSwisher, Texas
Wildrose Wind13INR0038Wind302.5 MWwithdrawnSwisher, Texas
Tulia 115 kV/Newhart 230 kVGEN-2015-032Wind300.0 MWwithdrawnSwisher, Texas
Lazarus Solar21INR0435Solar300.0 MWwithdrawnSwisher, Texas
Hornet Solar II SLF25INR0282Solar201.5 MWoperationalSwisher, Texas
TX Nazareth Solar67575_NZRTHSolar201.0 MWactiveSwisher, Texas
Swisher 230kV SubstationGEN-2023-119Solar200.0 MWwithdrawnSwisher, Texas
Hornet Solar II (TX) (Hybrid)67985_HRNT2Solar200.0 MWactiveSwisher, Texas
Hornet Solar II (TX) (Hybrid)67985_HRT2BBattery200.0 MWactiveSwisher, Texas
Kress 115 kV SubstationGEN-2022-165Battery200.0 MWwithdrawnSwisher, Texas
Stem Solar24INR0003Solar200.0 MWoperationalSwisher, Texas
Swisher 230kVGEN-2015-031Wind150.5 MWwithdrawnSwisher, Texas
Kress 115 kV SubstationGEN-2023-120Solar130.0 MWactiveSwisher, Texas
Swisher 115kV SubstationGEN-2022-197Solar112.0 MWwithdrawnSwisher, Texas
Happy 115 kV SubGEN-2016-002Wind74.0 MWwithdrawnSwisher, Texas
Hornet Solar 2 LLC Cancelled23INR0505Solar11.0 MWwithdrawnSwisher, Texas
Hornet Energy Storage SLF27INR0625Other0.0 MWactiveSwisher, Texas
Hornet Storage II SLF25INR0283Other0.0 MWoperationalSwisher, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Swisher County.

Start tracking with interXdata