Hoskins 345kV (GEN-2016-021)

Hoskins 345kV is a 298.5 MW wind interconnection project in Dixon County, Nebraska with a current status of operational. It is proposed to connect at Hoskins 345kV.

298.5 MWCapacity
OperationalStatus
NEMarket
WindTechnology

Project facts

Canonical nameHoskins 345kV
Queue IDGEN-2016-021
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketNE
TechnologyWind
Capacity298.5 MW
StateNebraska
CountyDixon County
Point of interconnectionHoskins 345kV
Requested (queue) date2016-03-31
Proposed in-service date
Operational date2018-12-01
Withdrawn date
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata