Howle Storage (23INR0292)

Howle Storage is a 30.0 MW other interconnection project in Ellis, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 1907 Venus - 68090 Sam Sw_x000D_ Same location as 20INR0075 - Howle Solar.

30.0 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameHowle Storage
Queue ID23INR0292
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity30.0 MW
StateTexas
CountyEllis
Point of interconnectiontap 345kV 1907 Venus - 68090 Sam Sw_x000D_ Same location as 20INR0075 - Howle Solar
Requested (queue) date2021-06-06
Proposed in-service date2024-12-31
Operational date
Withdrawn date2023-05-01
DeveloperHowle Solar LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata