Hudson Valley Data Center (1682)

Hudson Valley Data Center is a 50.0 MW other interconnection project in Rockland, New York with a current status of withdrawn. It is proposed to connect at Line 60 138kV - Ramapo to Tallman.

50.0 MWCapacity
WithdrawnStatus
NYISOMarket
OtherTechnology

Project facts

Canonical nameHudson Valley Data Center
Queue ID1682
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyOther
Capacity50.0 MW
StateNew York
CountyRockland
Point of interconnectionLine 60 138kV - Ramapo to Tallman
Requested (queue) date2024-04-24
Proposed in-service date
Operational date
Withdrawn date
DeveloperEquity Suffern Developers, LLC
Utility / transmission ownerO&R

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata