Hunter (6165_2)

Hunter is a 488.3 MW other interconnection project in Emery, Utah with a current status of operational.

488.3 MWCapacity
OperationalStatus
PACEMarket
OtherTechnology

Project facts

Canonical nameHunter
Queue ID6165_2
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologyOther
Capacity488.3 MW
StateUtah
CountyEmery
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1980-06-01
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata