HUNTINGTON BEACH 2 is a 59.3 MW gas interconnection project in Orange, California with a current status of withdrawn. It is proposed to connect at Huntington Beach Switching Station 230kV .

59.3 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameHUNTINGTON BEACH 2
Queue ID960
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity59.3 MW
StateCalifornia
CountyOrange
Point of interconnectionHuntington Beach Switching Station 230kV
Requested (queue) date2013-04-30
Proposed in-service date
Operational date
Withdrawn date2015-09-03
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata