Increase to Steam Turbine Capacity Uprate (See QP (243)

Increase to Steam Turbine Capacity Uprate (See QP is a 6.0 MW other interconnection project in Bristol, Massachusetts with a current status of operational. It is proposed to connect at Brayton Point 345 kV Switchyard.

6.0 MWCapacity
OperationalStatus
RIMarket
OtherTechnology

Project facts

Canonical nameIncrease to Steam Turbine Capacity Uprate (See QP
Queue ID243
Statusoperational
Source statusC
MarketRI
TechnologyOther
Capacity6.0 MW
StateMassachusetts
CountyBristol
Point of interconnectionBrayton Point 345 kV Switchyard
Requested (queue) date2008-01-04
Proposed in-service date
Operational date2011-12-12
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata