Increase to Steam Turbine Capacity Uprate (See QP (243)
Increase to Steam Turbine Capacity Uprate (See QP is a 6.0 MW other interconnection project in Bristol, Massachusetts with a current status of operational. It is proposed to connect at Brayton Point 345 kV Switchyard.
6.0 MWCapacity
OperationalStatus
RIMarket
OtherTechnology
Project facts
| Canonical name | Increase to Steam Turbine Capacity Uprate (See QP |
|---|---|
| Queue ID | 243 |
| Status | operational |
| Source status | C |
| Market | RI |
| Technology | Other |
| Capacity | 6.0 MW |
| State | Massachusetts |
| County | Bristol |
| Point of interconnection | Brayton Point 345 kV Switchyard |
| Requested (queue) date | 2008-01-04 |
| Proposed in-service date | — |
| Operational date | 2011-12-12 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.