Inertia Wind (22INR0326)

Inertia Wind is a 301.3 MW wind interconnection project in Haskell, Texas with a current status of operational. It is proposed to connect at tap 345kV 60515 Clear Crossing - 6104 Smoky Hill.

301.3 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameInertia Wind
Queue ID22INR0326
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity301.3 MW
StateTexas
CountyHaskell
Point of interconnectiontap 345kV 60515 Clear Crossing - 6104 Smoky Hill
Requested (queue) date2020-06-02
Proposed in-service date2023-11-10
Operational date2023-11-01
Withdrawn date
DeveloperInertia Wind Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata