Iron Javelin Emerald (AH1-367A)
Iron Javelin Emerald is a 72.0 MW solar interconnection project in Greene, Pennsylvania with a current status of withdrawn. It is proposed to connect at Franklin 138 kV II.
72.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | Iron Javelin Emerald |
|---|---|
| Queue ID | AH1-367A |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Solar |
| Capacity | 72.0 MW |
| State | Pennsylvania |
| County | Greene |
| Point of interconnection | Franklin 138 kV II |
| Requested (queue) date | 2025-03-03 |
| Proposed in-service date | 2023-09-10 |
| Operational date | — |
| Withdrawn date | 2025-12-01 |
| Developer | Emerald Renewable LLC |
| Utility / transmission owner | APS |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.