Jack County III – 345 kV (26INR0351)

Jack County III – 345 kV is a 660.0 MW gas interconnection project in Jack, Texas with a current status of operational. It is proposed to connect at Substation Name: JACK COUNTY 2 PLANT STATION CODE: JCKCNTY2 BUS NUMBER: 575 .

660.0 MWCapacity
OperationalStatus
JackMarket
GasTechnology

Project facts

Canonical nameJack County III – 345 kV
Queue ID26INR0351
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketJack
TechnologyGas
Capacity660.0 MW
StateTexas
CountyJack
Point of interconnectionSubstation Name: JACK COUNTY 2 PLANT STATION CODE: JCKCNTY2 BUS NUMBER: 575
Requested (queue) date2023-11-14
Proposed in-service date
Operational date2027-07-01
Withdrawn date
DeveloperJack County Power, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.