Jade Flash Storage (26INR0516)

Jade Flash Storage is a 320.0 MW battery interconnection project in Scurry, Texas with a current status of suspended.

320.0 MWCapacity
SuspendedStatus
ScurryMarket
BatteryTechnology

Project facts

Canonical nameJade Flash Storage
Queue ID26INR0516
Statussuspended
Source status
MarketScurry
TechnologyBattery
Capacity320.0 MW
StateTexas
CountyScurry
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectsuspendedhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata