James River 115 kV (AH1-213)

James River 115 kV is a 52.5 MW solar interconnection project in Fluvanna, Virginia with a current status of withdrawn.

52.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameJames River 115 kV
Queue IDAH1-213
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity52.5 MW
StateVirginia
CountyFluvanna
Point of interconnection
Requested (queue) date2021-09-09
Proposed in-service date2025-02-01
Operational date
Withdrawn date2024-04-01
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.