Jasper-Holly Springs 138 kV line tap (J3079)

Jasper-Holly Springs 138 kV line tap is a 200.0 MW solar interconnection project in Jasper, Texas with a current status of withdrawn. It is proposed to connect at Jasper-Holly Springs 138 kV line tap.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameJasper-Holly Springs 138 kV line tap
Queue IDJ3079
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateTexas
CountyJasper
Point of interconnectionJasper-Holly Springs 138 kV line tap
Requested (queue) date2022-09-14
Proposed in-service date2026-10-01
Operational date2026-10-01
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata