Jasper County, Texas — Interconnection Projects
The interXdata warehouse tracks 11 interconnection projects in Jasper, Texas, representing 527 MW of requested capacity.
11Total projects
0Active
5Operational
4Withdrawn
527 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 409 MW |
| Other | 7 | 118 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Jasper-Holly Springs 138 kV line tap | J3079 | Solar | 200.0 MW | withdrawn | Jasper, Texas |
| Buna SW to Call Transmission Line | J2103 | Solar | 100.0 MW | withdrawn | Jasper, Texas |
| Peachtree Substation | J3425 | Solar | 59.2 MW | withdrawn | Jasper, Texas |
| Mill Creek SW Station 138 kV | J2976 | Solar | 50.0 MW | withdrawn | Jasper, Texas |
| WestRock (TX) | 50101_GEN2 | Other | 32.6 MW | operational | Jasper, Texas |
| Sam Rayburn Dam | 6413_1 | Other | 26.0 MW | operational | Jasper, Texas |
| Sam Rayburn Dam | 6413_2 | Other | 26.0 MW | operational | Jasper, Texas |
| WestRock (TX) | 50101_GEN3 | Other | 17.6 MW | operational | Jasper, Texas |
| WestRock (TX) | 50101_GEN1 | Other | 7.5 MW | operational | Jasper, Texas |
| Robert D Willis | 7200_2 | Other | 4.0 MW | suspended | Jasper, Texas |
| Robert D Willis | 7200_1 | Other | 4.0 MW | suspended | Jasper, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Jasper County.
Start tracking with interXdata