Jasper County, Texas — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Jasper, Texas, representing 527 MW of requested capacity.

11Total projects
0Active
5Operational
4Withdrawn
527 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar4409 MW
Other7118 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Jasper-Holly Springs 138 kV line tapJ3079Solar200.0 MWwithdrawnJasper, Texas
Buna SW to Call Transmission LineJ2103Solar100.0 MWwithdrawnJasper, Texas
Peachtree SubstationJ3425Solar59.2 MWwithdrawnJasper, Texas
Mill Creek SW Station 138 kVJ2976Solar50.0 MWwithdrawnJasper, Texas
WestRock (TX)50101_GEN2Other32.6 MWoperationalJasper, Texas
Sam Rayburn Dam6413_1Other26.0 MWoperationalJasper, Texas
Sam Rayburn Dam6413_2Other26.0 MWoperationalJasper, Texas
WestRock (TX)50101_GEN3Other17.6 MWoperationalJasper, Texas
WestRock (TX)50101_GEN1Other7.5 MWoperationalJasper, Texas
Robert D Willis7200_2Other4.0 MWsuspendedJasper, Texas
Robert D Willis7200_1Other4.0 MWsuspendedJasper, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27