Jerry Smith Storage (1620)

Jerry Smith Storage is a 20.0 MW battery interconnection project in Tompkins, New York with a current status of withdrawn. It is proposed to connect at Miliken- Ludlowville 34.5kV line.

20.0 MWCapacity
WithdrawnStatus
CMarket
BatteryTechnology

Project facts

Canonical nameJerry Smith Storage
Queue ID1620
Statuswithdrawn
Source status0
MarketC
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyTompkins
Point of interconnectionMiliken- Ludlowville 34.5kV line
Requested (queue) date2023-10-12
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperNexamp Solar
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata