Jim Wells BESS (27INR0154)

Jim Wells BESS is a 100.3 MW battery interconnection project in Jim Wells, Texas with a current status of active. It is proposed to connect at 69kV PREMONT (#8894).

100.3 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameJim Wells BESS
Queue ID27INR0154
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity100.3 MW
StateTexas
CountyJim Wells
Point of interconnection69kV PREMONT (#8894)
Requested (queue) date2024-02-07
Proposed in-service date2028-06-30
Operational date
Withdrawn date
DeveloperJim Wells ESS
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.