Jones City 2 Solar (66893_TXJS2)

Jones City 2 Solar is a 200.0 MW battery interconnection project in Jones, Texas with a current status of active.

200.0 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameJones City 2 Solar
Queue ID66893_TXJS2
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketERCO
TechnologyBattery
Capacity200.0 MW
StateTexas
CountyJones
Point of interconnection
Requested (queue) date
Proposed in-service date2027-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerLightsource Renewable Energy Asset Management, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.