Juanita Creek BESS (29INR0151)

Juanita Creek BESS is a 303.6 MW battery interconnection project in Matagorda, Texas with a current status of suspended.

303.6 MWCapacity
SuspendedStatus
MatagordaMarket
BatteryTechnology

Project facts

Canonical nameJuanita Creek BESS
Queue ID29INR0151
Statussuspended
Source status—
MarketMatagorda
TechnologyBattery
Capacity303.6 MW
StateTexas
CountyMatagorda
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—suspendedhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata