Juanita Hill Storage (21INR0480)

Juanita Hill Storage is a 103.8 MW other interconnection project in Wharton, Texas with a current status of withdrawn. It is proposed to connect at 44200 Hillje 345kV.

103.8 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameJuanita Hill Storage
Queue ID21INR0480
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity103.8 MW
StateTexas
CountyWharton
Point of interconnection44200 Hillje 345kV
Requested (queue) date2019-11-26
Proposed in-service date2023-09-01
Operational date
Withdrawn date2023-05-02
DeveloperKCE TX 20, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata