Jubal Early-Austinville 138kV (Y1-006)

Jubal Early-Austinville 138kV is a 72.0 MW wind interconnection project in Carroll, Virginia with a current status of withdrawn.

72.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameJubal Early-Austinville 138kV
Queue IDY1-006
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity72.0 MW
StateVirginia
CountyCarroll
Point of interconnection
Requested (queue) date2012-02-14
Proposed in-service date2023-03-01
Operational date
Withdrawn date2021-10-17
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.