Judkins BESS (24INR0586)

Judkins BESS is a 9.9 MW other interconnection project in Ector, Texas with a current status of operational. It is proposed to connect at LDLXFMR1/1102/JDKNS.

9.9 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameJudkins BESS
Queue ID24INR0586
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity9.9 MW
StateTexas
CountyEctor
Point of interconnectionLDLXFMR1/1102/JDKNS
Requested (queue) date2023-06-12
Proposed in-service date2024-02-29
Operational date2024-02-22
Withdrawn date
DeveloperHEN Infrastructure, LLC 1
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata