Juniper Solar (FL) (65683_1)

Juniper Solar (FL) is a 70.0 MW solar interconnection project in Pasco, Florida with a current status of operational.

70.0 MWCapacity
OperationalStatus
TECMarket
SolarTechnology

Project facts

Canonical nameJuniper Solar (FL)
Queue ID65683_1
Statusoperational
Source status(OP) Operating
MarketTEC
TechnologySolar
Capacity70.0 MW
StateFlorida
CountyPasco
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-12-01
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata