Juno Solar (Phase I) (21INR0026)

Juno Solar (Phase I) is a 166.1 MW solar interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at 59906 Long Draw 138 kV.

166.1 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameJuno Solar (Phase I)
Queue ID21INR0026
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity166.1 MW
StateTexas
CountyBorden
Point of interconnection59906 Long Draw 138 kV
Requested (queue) date2018-08-13
Proposed in-service date2021-05-17
Operational date2021-05-26
Withdrawn date
DeveloperSE Juno, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.