Karankawa 2 Wind (19INR0074)
Karankawa 2 Wind is a 101.0 MW wind interconnection project in San Patricio, Texas with a current status of operational. It is proposed to connect at tap 345kV 8455 Lon Hill - 5725 Pawnee.
101.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology
Project facts
| Canonical name | Karankawa 2 Wind |
|---|---|
| Queue ID | 19INR0074 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Wind |
| Capacity | 101.0 MW |
| State | Texas |
| County | San Patricio |
| Point of interconnection | tap 345kV 8455 Lon Hill - 5725 Pawnee |
| Requested (queue) date | 2017-05-11 |
| Proposed in-service date | 2019-12-26 |
| Operational date | 2019-11-05 |
| Withdrawn date | — |
| Developer | Avangrid Power, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata