Kelly to Fort Randall 230kV (GEN-2018-130)

Kelly to Fort Randall 230kV is a 122.0 MW wind interconnection project in Knox, Nebraska with a current status of withdrawn. It is proposed to connect at Kelly to Fort Randall 230kV.

122.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameKelly to Fort Randall 230kV
Queue IDGEN-2018-130
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity122.0 MW
StateNebraska
CountyKnox
Point of interconnectionKelly to Fort Randall 230kV
Requested (queue) date2018-11-21
Proposed in-service date
Operational date
Withdrawn date2022-05-05
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.