Keystone 345 kV Substation (GEN-2023-117)

Keystone 345 kV Substation is a 300.0 MW wind interconnection project in Keith, Deuel, Garden, Nebraska with a current status of withdrawn. It is proposed to connect at Keystone 345 kV Substation.

300.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameKeystone 345 kV Substation
Queue IDGEN-2023-117
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity300.0 MW
StateNebraska
CountyKeith, Deuel, Garden
Point of interconnectionKeystone 345 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2030-12-30
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.