KING FLAT WIND FARM 2 (1358)

KING FLAT WIND FARM 2 is a 100.0 MW wind interconnection project in Yolo, California with a current status of withdrawn. It is proposed to connect at Delevan-Vaca No. 2& No. 3 230kV.

100.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameKING FLAT WIND FARM 2
Queue ID1358
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity100.0 MW
StateCalifornia
CountyYolo
Point of interconnectionDelevan-Vaca No. 2& No. 3 230kV
Requested (queue) date2017-05-01
Proposed in-service date
Operational date
Withdrawn date2018-03-12
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.