Kings Dominion DP 115 kV (AG1-134 - moved to TC1)

Kings Dominion DP 115 kV is a 100.0 MW solar interconnection project in King William, Virginia with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameKings Dominion DP 115 kV
Queue IDAG1-134 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity100.0 MW
StateVirginia
CountyKing William
Point of interconnection—
Requested (queue) date2020-09-02
Proposed in-service date2024-12-01
Operational date—
Withdrawn date2024-06-24
Developer—
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata