Knapp BESS (25INR0747)
Knapp BESS is a 9.9 MW other interconnection project in Scurry, Texas with a current status of active. It is proposed to connect at Station Name: KNAPP Station Code: KNAPP Station Bus Number: #1310 Station Transmission Voltage: 138 kV Load/Load Transformer Name: LDLXFMR2 Distribution Voltage: 12.47 kV.
Project facts
| Canonical name | Knapp BESS |
|---|---|
| Queue ID | 25INR0747 |
| Status | active |
| Source status | — |
| Market | Scurry |
| Technology | Other |
| Capacity | 9.9 MW |
| State | Texas |
| County | Scurry |
| Point of interconnection | Station Name: KNAPP Station Code: KNAPP Station Bus Number: #1310 Station Transmission Voltage: 138 kV Load/Load Transformer Name: LDLXFMR2 Distribution Voltage: 12.47 kV |
| Requested (queue) date | — |
| Proposed in-service date | 2025-12-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Knapp ESS Assets, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata