Knapp BESS is a 9.9 MW other interconnection project in Scurry, Texas with a current status of active. It is proposed to connect at Station Name: KNAPP Station Code: KNAPP Station Bus Number: #1310 Station Transmission Voltage: 138 kV Load/Load Transformer Name: LDLXFMR2 Distribution Voltage: 12.47 kV.

9.9 MWCapacity
ActiveStatus
ScurryMarket
OtherTechnology

Project facts

Canonical nameKnapp BESS
Queue ID25INR0747
Statusactive
Source status
MarketScurry
TechnologyOther
Capacity9.9 MW
StateTexas
CountyScurry
Point of interconnectionStation Name: KNAPP Station Code: KNAPP Station Bus Number: #1310 Station Transmission Voltage: 138 kV Load/Load Transformer Name: LDLXFMR2 Distribution Voltage: 12.47 kV
Requested (queue) date
Proposed in-service date2025-12-30
Operational date
Withdrawn date
DeveloperKnapp ESS Assets, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata