Knickerbocker Storage II (25INR0043)

Knickerbocker Storage II is a 178.2 MW other interconnection project in Tom Green, Texas with a current status of withdrawn. It is proposed to connect at Tap 345kV 76003 Big Hill - 76009 Twin Buttes_x000D_ .

178.2 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameKnickerbocker Storage II
Queue ID25INR0043
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity178.2 MW
StateTexas
CountyTom Green
Point of interconnectionTap 345kV 76003 Big Hill - 76009 Twin Buttes_x000D_
Requested (queue) date2022-02-20
Proposed in-service date2025-01-15
Operational date
Withdrawn date2022-03-11
DeveloperSan Angelo Solar 2 LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata