Kobernat Storage (26INR0323)
Kobernat Storage is a 51.5 MW battery interconnection project in Starr, Texas with a current status of withdrawn. It is proposed to connect at A DIRECT CONNECTION TO A NEW SWITCHING STATION ON THE AEP TEXAS CENTRAL OWNED GARZA (BUS #8399) - LISTON - (BUS #8394) 138 KV LINE.
Project facts
| Canonical name | Kobernat Storage |
|---|---|
| Queue ID | 26INR0323 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 51.5 MW |
| State | Texas |
| County | Starr |
| Point of interconnection | A DIRECT CONNECTION TO A NEW SWITCHING STATION ON THE AEP TEXAS CENTRAL OWNED GARZA (BUS #8399) - LISTON - (BUS #8394) 138 KV LINE |
| Requested (queue) date | 2024-02-01 |
| Proposed in-service date | 2026-12-30 |
| Operational date | — |
| Withdrawn date | 2025-04-01 |
| Developer | BT Kobernat Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata