Kobernat Storage (26INR0323)

Kobernat Storage is a 51.5 MW battery interconnection project in Starr, Texas with a current status of withdrawn. It is proposed to connect at A DIRECT CONNECTION TO A NEW SWITCHING STATION ON THE AEP TEXAS CENTRAL OWNED GARZA (BUS #8399) - LISTON - (BUS #8394) 138 KV LINE.

51.5 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameKobernat Storage
Queue ID26INR0323
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity51.5 MW
StateTexas
CountyStarr
Point of interconnectionA DIRECT CONNECTION TO A NEW SWITCHING STATION ON THE AEP TEXAS CENTRAL OWNED GARZA (BUS #8399) - LISTON - (BUS #8394) 138 KV LINE
Requested (queue) date2024-02-01
Proposed in-service date2026-12-30
Operational date
Withdrawn date2025-04-01
DeveloperBT Kobernat Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.