Koppelman Sun CSG (61381_KOPP3)

Koppelman Sun CSG is a 1.0 MW solar interconnection project in Blue Earth, Minnesota with a current status of operational.

1.0 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameKoppelman Sun CSG
Queue ID61381_KOPP3
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity1.0 MW
StateMinnesota
CountyBlue Earth
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2017-11-01
Withdrawn date
Developer
Utility / transmission ownerGeronimo Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata