Kress 115 kV Substation (GEN-2023-120)
Kress 115 kV Substation is a 130.0 MW solar interconnection project in Swisher, Texas with a current status of active. It is proposed to connect at Kress 115 kV Substation.
130.0 MWCapacity
ActiveStatus
TXMarket
SolarTechnology
Project facts
| Canonical name | Kress 115 kV Substation |
|---|---|
| Queue ID | GEN-2023-120 |
| Status | active |
| Source status | IA PENDING |
| Market | TX |
| Technology | Solar |
| Capacity | 130.0 MW |
| State | Texas |
| County | Swisher |
| Point of interconnection | Kress 115 kV Substation |
| Requested (queue) date | 2023-10-02 |
| Proposed in-service date | 2030-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SPS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata