Kress 115 kV Substation (GEN-2023-120)

Kress 115 kV Substation is a 130.0 MW solar interconnection project in Swisher, Texas with a current status of active. It is proposed to connect at Kress 115 kV Substation.

130.0 MWCapacity
ActiveStatus
TXMarket
SolarTechnology

Project facts

Canonical nameKress 115 kV Substation
Queue IDGEN-2023-120
Statusactive
Source statusIA PENDING
MarketTX
TechnologySolar
Capacity130.0 MW
StateTexas
CountySwisher
Point of interconnectionKress 115 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2030-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.