Kress 115kV is a 400.0 MW battery interconnection project in Swisher, Texas with a current status of withdrawn. It is proposed to connect at Kress 115kV.

400.0 MWCapacity
WithdrawnStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameKress 115kV
Queue IDGEN-2019-064
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyBattery
Capacity400.0 MW
StateTexas
CountySwisher
Point of interconnectionKress 115kV
Requested (queue) date2019-05-23
Proposed in-service date
Operational date
Withdrawn date2022-05-03
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.