La Morena Energy Center BESS (30INR0042)

La Morena Energy Center BESS is a 250.0 MW other interconnection project in Zapata, Texas with a current status of operational. It is proposed to connect at Tap 345 kV 80225 CENIZO7C - 80307 DELSOL7C .

250.0 MWCapacity
OperationalStatus
ZapataMarket
OtherTechnology

Project facts

Canonical nameLa Morena Energy Center BESS
Queue ID30INR0042
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketZapata
TechnologyOther
Capacity250.0 MW
StateTexas
CountyZapata
Point of interconnectionTap 345 kV 80225 CENIZO7C - 80307 DELSOL7C
Requested (queue) date2025-06-12
Proposed in-service date
Operational date2029-05-07
Withdrawn date
DeveloperAdapture Solar Development
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata