La Morena Energy Center Solar (30INR0043)
La Morena Energy Center Solar is a 250.0 MW solar interconnection project in Zapata, Texas with a current status of operational. It is proposed to connect at Tap 345 kV (80225) CENIZO7C - (80307) DELSOL7C.
250.0 MWCapacity
OperationalStatus
ZapataMarket
SolarTechnology
Project facts
| Canonical name | La Morena Energy Center Solar |
|---|---|
| Queue ID | 30INR0043 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Zapata |
| Technology | Solar |
| Capacity | 250.0 MW |
| State | Texas |
| County | Zapata |
| Point of interconnection | Tap 345 kV (80225) CENIZO7C - (80307) DELSOL7C |
| Requested (queue) date | 2025-06-12 |
| Proposed in-service date | — |
| Operational date | 2029-05-07 |
| Withdrawn date | — |
| Developer | Adapture Solar Development |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata