LA-SOLAR-20 (617A)

LA-SOLAR-20 is a 20.0 MW solar interconnection project in Los Angeles, California with a current status of withdrawn. It is proposed to connect at Piute-Redmond 66kV .

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLA-SOLAR-20
Queue ID617A
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity20.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionPiute-Redmond 66kV
Requested (queue) date2010-03-30
Proposed in-service date
Operational date
Withdrawn date2013-05-06
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata