Lake Koronis-Paynesville 69kV (J771)

Lake Koronis-Paynesville 69kV is a 50.0 MW solar interconnection project in Stearns County, Minnesota with a current status of withdrawn. It is proposed to connect at Lake Koronis-Paynesville 69kV.

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLake Koronis-Paynesville 69kV
Queue IDJ771
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StateMinnesota
CountyStearns County
Point of interconnectionLake Koronis-Paynesville 69kV
Requested (queue) date2016-11-14
Proposed in-service date2019-07-31
Operational date2019-07-31
Withdrawn date2019-04-09
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata