Lake Mabel Solar and Battery Storage (66128_BESS1)

Lake Mabel Solar and Battery Storage is a 40.0 MW battery interconnection project in Polk, Florida with a current status of operational.

40.0 MWCapacity
OperationalStatus
TECMarket
BatteryTechnology

Project facts

Canonical nameLake Mabel Solar and Battery Storage
Queue ID66128_BESS1
Statusoperational
Source status(OP) Operating
MarketTEC
TechnologyBattery
Capacity40.0 MW
StateFlorida
CountyPolk
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-03-01
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.