Lakeview-Brownfield 69kV line (GEN-2016-077)

Lakeview-Brownfield 69kV line is a 54.0 MW solar interconnection project in Terry, Texas with a current status of withdrawn. It is proposed to connect at Lakeview-Brownfield 69kV line.

54.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameLakeview-Brownfield 69kV line
Queue IDGEN-2016-077
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity54.0 MW
StateTexas
CountyTerry
Point of interconnectionLakeview-Brownfield 69kV line
Requested (queue) date2016-06-29
Proposed in-service date
Operational date
Withdrawn date2020-09-10
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.