Terry County, Texas — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Terry, Texas, representing 554 MW of requested capacity.

6Total projects
1Active
0Operational
5Withdrawn
554 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar5504 MW
Battery150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Flatlands 115 kV SubstationGEN-2021-054Solar150.0 MWwithdrawnTerry, Texas
Flatland 115 kV SubstationGEN-2017-187Solar150.0 MWactiveTerry, Texas
Yoakum-Seagraves 115kV circuitGEN-2016-090Solar100.0 MWwithdrawnTerry, Texas
Lakeview-Brownfield 69kV lineGEN-2016-077Solar54.0 MWwithdrawnTerry, Texas
Terry County 115kV; (Alt. POI) Tap Clauene - Terry County 115kVGEN-2014-044Solar50.0 MWwithdrawnTerry, Texas
Flatland 115 kV SubstationGEN-2018-086Battery50.0 MWwithdrawnTerry, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.