Lantana BESS (25INR0647)

Lantana BESS is a 10.0 MW battery interconnection project in Nueces, Texas with a current status of active. It is proposed to connect at Station Name: LANTANA Load Name or Load Transformer name: LOAD1 Bus#: 8965 Voltage: 69kV.

10.0 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameLantana BESS
Queue ID25INR0647
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity10.0 MW
StateTexas
CountyNueces
Point of interconnectionStation Name: LANTANA Load Name or Load Transformer name: LOAD1 Bus#: 8965 Voltage: 69kV
Requested (queue) date2024-04-03
Proposed in-service date2026-02-27
Operational date
Withdrawn date
DeveloperAggreko MSR Grid PC5
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata