Laramie River Station-Sidney 345 kV (GEN-2015-094)

Laramie River Station-Sidney 345 kV is a 151.8 MW wind interconnection project in Banner, Nebraska with a current status of withdrawn. It is proposed to connect at Laramie River Station-Sidney 345 kV.

151.8 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameLaramie River Station-Sidney 345 kV
Queue IDGEN-2015-094
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity151.8 MW
StateNebraska
CountyBanner
Point of interconnectionLaramie River Station-Sidney 345 kV
Requested (queue) date2015-10-22
Proposed in-service date
Operational date
Withdrawn date2016-03-11
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata