Larimar Storage (26INR0383)
Larimar Storage is a 100.9 MW battery interconnection project in Bee, Texas with a current status of withdrawn. It is proposed to connect at A DIRECT CONNECTION TO A NEW SWITCHING STATION ON THE KENEDYSW4A (BUS #8186) ‚Äê TULETA4A (BUS #8590) 138 KV LINE.
Project facts
| Canonical name | Larimar Storage |
|---|---|
| Queue ID | 26INR0383 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 100.9 MW |
| State | Texas |
| County | Bee |
| Point of interconnection | A DIRECT CONNECTION TO A NEW SWITCHING STATION ON THE KENEDYSW4A (BUS #8186) ‚Äê TULETA4A (BUS #8590) 138 KV LINE |
| Requested (queue) date | 2024-01-10 |
| Proposed in-service date | 2026-12-18 |
| Operational date | — |
| Withdrawn date | 2025-04-01 |
| Developer | BT S7 Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata