LAS HERMANAS BESS (1276)

LAS HERMANAS BESS is a 110.0 MW battery interconnection project in Shasta, California with a current status of withdrawn. It is proposed to connect at Carberry Switching Station 230kV.

110.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameLAS HERMANAS BESS
Queue ID1276
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity110.0 MW
StateCalifornia
CountyShasta
Point of interconnectionCarberry Switching Station 230kV
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2016-07-22
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.