Las Majadas Wind (17INR0035)

Las Majadas Wind is a 272.6 MW wind interconnection project in Willacy, Texas with a current status of operational. It is proposed to connect at 8318 Rio Hondo 345kV plus 12.5mi gentie.

272.6 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameLas Majadas Wind
Queue ID17INR0035
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity272.6 MW
StateTexas
CountyWillacy
Point of interconnection8318 Rio Hondo 345kV plus 12.5mi gentie
Requested (queue) date2015-10-29
Proposed in-service date2023-06-30
Operational date2023-07-13
Withdrawn date
DeveloperEDF Renewables Development, Inc.
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata