LeLand Olds-Fort Thompson 345kV line (GEN-2022-169)

LeLand Olds-Fort Thompson 345kV line is a 220.0 MW solar interconnection project in Hyde, South Dakota with a current status of withdrawn. It is proposed to connect at LeLand Olds-Fort Thompson 345kV line.

220.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameLeLand Olds-Fort Thompson 345kV line
Queue IDGEN-2022-169
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity220.0 MW
StateSouth Dakota
CountyHyde
Point of interconnectionLeLand Olds-Fort Thompson 345kV line
Requested (queue) date2023-02-26
Proposed in-service date2027-11-15
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata