Hyde County, South Dakota — Interconnection Projects

The interXdata warehouse tracks 13 interconnection projects in Hyde, South Dakota, representing 3,079 MW of requested capacity.

13Total projects
0Active
4Operational
9Withdrawn
3,079 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind122,859 MW
Solar1220 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Chappelle Creek 345 kV SubstationGEN-2023-106Wind504.0 MWwithdrawnHyde, South Dakota
Triple H Wind Project63103_WTGWind250.2 MWoperationalHyde, South Dakota
Chappelle Creek 345 kVGEN-2022-070Wind250.0 MWwithdrawnHyde, South Dakota
Chappelle Creek 345 kVGEN-2022-069Wind250.0 MWwithdrawnHyde, South Dakota
Chappelle Creek 345 kV SubstationGEN-2024-202Wind250.0 MWwithdrawnHyde, South Dakota
Chappelle Creek 345 kVGEN-2022-068Wind250.0 MWwithdrawnHyde, South Dakota
Chappelle Creek 345 kVGEN-2023-105Wind249.0 MWwithdrawnHyde, South Dakota
Chappelle Creek 345kVGEN-2016-103Wind240.0 MWwithdrawnHyde, South Dakota
LeLand Olds-Fort Thompson 345kV lineGEN-2022-169Solar220.0 MWwithdrawnHyde, South Dakota
North Bend Wind Project, LLC67002_NBENDWind200.0 MWoperationalHyde, South Dakota
Tap Ft Thompson - Oahe 230kV Line (Single Circuit)GEN-2016-094Wind200.0 MWoperationalHyde, South Dakota
Chappelle Creek 345kVGEN-2016-092Wind175.0 MWwithdrawnHyde, South Dakota
South Dakota Wind Energy Cente56092_GE15Wind40.5 MWoperationalHyde, South Dakota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Hyde County.

Start tracking with interXdata